banner

SPECIAL BOARD MEETING
Santa Rosa City Schools
November 20, 2019 6:00PM
3:30 p.m. - Closed Session 6:00 p.m. - Open Session Santa Rosa City Schools District Office Board Room 211 Ridgway Avenue, Santa Rosa

A. CALL TO ORDER (3:30)
Minutes:
The meeting was called to order at 3:30 p.m.
A.1. Public Comment On Closed Session Agenda
Minutes:
There were no public comments.
B. RECESS TO CLOSED SESSION
Minutes:
The Board recessed to closed session to discuss the items on the closed session agenda.
B.1. Public Employee Performance Evaluation (Title of employee being reviewed: Superintendent, Deputy Superintendent, Assistant Superintendents, Principals, Vice Principals, Assistant Principals, Directors, Coordinators) [Gov. Code § 54957]
B.2. Conference With Legal Counsel - Existing Litigation (Case name: Santa Rosa Teachers Association v. SRCS) [Gov. Code § 54956.9]
C. RECONVENE TO OPEN SESSION (6:00)
Minutes:
The meeting was reconvened at 6:00 p.m.
C.1. Pledge of Allegiance
Minutes:
Vice-President, Laurie Fong, led the Pledge of Allegiance.
C.2. Public Comment On Agenda Items, Only
Minutes:
There were no public comments.
D. DISCUSSION / ACTION ITEMS
D.1. (Action) Designation of Board of Education Directors to An Ad Hoc Committee to Study and Analyze Options For The Use Of Proceeds Including a Down Payment Assistance Program From The Sale of The Fir Ridge Parcel (APN 173-620-030)
Speaker:
Diann Kitamura, Superintendent
Quick Summary / Abstract:

The Board will consider the creation of an ad hoc committee to study and review options for the use of proceeds from the anticipated sale of the Fir Ridge Parcel. 

Rationale:

Purpose

This is to select up to three (3) Directors to participate on the Ad Hoc Committee to study and review options for the anticipated sale of the Fir Ridge Parcel. 

Additional members of Ad Hoc Committee will be identified and invited to participate including but not limited to the following:

  • District Administrators
  • Site Administrators
  • Certificated and Classified Employee Representatives
  • Community Members

The Ad Hoc committee with be charged with evaluating options for the anticipated proceeds from the sale of the Fir Ridge parcel to prepare a recommendation to the full Board for consideration. 

Considerations

An amendment to the Memorandum of Understanding (MOU) between the City of Santa Rosa and Santa Rosa City Schools to allow alternative to the construction of affordable housing or school facilities on Fir Ridge Ridge Drive, Lot "F" (APN 173-620-030) was approved on October 14, 2019 at the joint meeting of the Santa Rosa City Council and Santa Rosa City Schools Board. 

SRCS has previously investigated the feasibility of providing employee housing at the Fir Ridge location. Through multiple attempts, it was determined that development of the site per the original agreement would not be feasible or provide a benefit to SRCS employees. Additionally, SRCS conducted an employee housing survey to identify preference and need for housing. Through the survey, approximately 80% of the respondents noted that Down Payment Assistance would be desirable.

This information was used to negotiate new terms with the City of Santa Rosa in order to provide additional options for the use of the Fir Ridge property. Through the amendment to the MOU, SRCS now has options for the Fir Ridge property to consider as outlined below. 

  1. Sell the Site and use Proceeds to develop housing or to create a down payment assistance program

The District may sell the Site with the requirement that the District will deposit all proceeds (“Proceeds”) received from the sale, less any customary fees or costs required to close the transaction, into a separate account to be used for financing the construction or acquisition of housing for District employees or, as another option, to create a Loan Program for District employees. Each of these options is described in more detail below.

a. Development or Acquisition of Housing Off Site

The Proceeds would be used for financing the construction or acquisition of housing units for District employees in alternate locations within the City limits. This could involve partnership with a developer to create the units or to obtain units in an active development project.  Initial conversations with proposed development projects in the downtown have indicated that there is interest in this approach to support new transit-oriented development projects.

b. Down Payment Assistance Program

The proceeds would be used towards the creation of a revolving fund loan program to provide down payment assistance to District employees. During the October 1, 2019, study session, the Council provided direction for the District to determine the eligibility criteria based upon what the District identifies to be the greatest benefit for their employees. The following are the terms should the District pursue this option:

  1. District would create and implement the Loan Program, including:

    1. Establishing qualification criteria for assistance under the Loan Program, which would comply with all Federal, State and Local laws and be limited to District employees; and
    2. Ensure that the units and/or Proceeds remain a viable resource for District employees through a Resale Restriction Agreement recorded against the property which outlines the occupancy requirements of the unit, and the disposition of loan proceeds in the event of the sale of the property, default, or payoff of the loan. 

Previous Board History

October 23, 2019 (Item F.3): Discussion regarding the approved MOU between the City of Santa Rosa and Santa Rosa City Schools for the Fir Ridge Property

October 14, 2019 (Item A.3): Joint Meeting with the Santa Rosa City Council - Approval of the First Amendment to Memorandum of Understanding (MOU) Between the City of Santa Rosa and Santa Rosa City Schools To Allow An Alternative To the Construction of Affordable Housing or School Facilities On Fir Ridge Ridge Drive, Lot "F" (APN 173-620-030)

 
Actions:
Motion
Designate Omar Medina, Jenni Klose and Ed Sheffield to an ad hoc committee to study and analyze options for the use of proceeds including a down payment assistance program from the sale of the Fir Ridge Parcel (APN 173-620-030). Passed with a motion by Jill McCormick and a second by Stephanie Manieri.
Vote:
Yes Alegria De La Cruz.
Yes Laurie Fong.
Absent Jenni Klose.
Yes Stephanie Manieri.
Yes Jill McCormick.
Yes Omar Medina.
Absent Ed Sheffield.
D.2. (Action) Approval of a Memorandum of Understanding (MOU) Between Santa Rosa City Schools and Community Matters To Be the Fiscal Sponsor for the Santa Rosa Foundation
Speaker:
President Jenni Klose, Dr. Diann Kitamura
Quick Summary / Abstract:

The Board will consider approval of the memorandum of Understanding between Santa Rosa City Schools and Community Matter. Community Matters would be the fiscal sponsor to the "Made in Santa Rosa" Foundation while the foundation gains non-profit status. 

Rationale:

Purpose

In the 2018-19 school year our schools received a total of $324,286.00 in donations.  The range in donations at the lowest was $600 and the highest was $94,055.  A SRCS foundation would help support those school receiving little funds from donations and allowing them to access the same enrichment activities and supports as their peers at other schools.

Considerations

A foundation is an entirely separate entity from a school or the school district and therefore requires its own administrator, Board, bylaws, and budget.  A non profit status would need to be established along with various other requirements to be a charitable foundation. Non Profit Law Blog

Start up funds for an SRCS foundation must be identified and an administrator hired to organize and complete the process of establishing the non profit organization.  At the same time the administrator must begin networking with the community to establish partnerships for fundraising to ensure the sustainability of the foundation as grants are provided to school sites. There are several successful school foundations that can serve as a model for the SRCS foundation.

The Ad Hoc Committee considered many aspects of forming a foundation to assist in serving the needs of elementary and middles schools that often receive minimal donations.  A sample mission and vision were created along with ideas to provide financial support from a foundation that could be accessed by a school site. A working foundation name is the "Made in Santa Rosa Foundation."

  • Mission: To provide equitable opportunities for all of Santa Rosa City Schools’ elementary and middle school students by supporting the educational and enrichment programs that they need and deserve
  • Vision:  We believe in the transformative power of education to close opportunity and achievement gaps in our schools. Our goal is to build a bridge between the school district and community resources, ensuring equitable access to schools where such transformation is possible. Transformative schools strive to develop the whole child, set high expectations and provide the support needed to achieve them.

 Each of our schools will have the assets to provide its students with:

  • On-site tutoring

  • Access to Gardens and Environmental Studies

  • Engaging field trips that expand students’ experiences and encourage community engagement

  • Opportunities to develop a passion for music and art

  • Science facilitators and hands-on experience in the sciences

  • Relevant 21st Century technology

  • Programs that teach and encourage healthy lifestyles and physical fitness

  • After-school enrichment opportunities, such as chess club, video production, and foreign language classes

  • Programs that help create or nurture a college-going culture for students

Initial funding of $151,000 for the "Made in Santa Rosa Foundation" is provided by the unspecified district donations from the 2017 fires. (These were donations to Santa Rosa City Schools without a specified purpose.)

Fiscal Sponsor 

A fiscal sponsor is required to manage the funds of the foundation until the "Made in Santa Rosa Foundation" receives its 501(3)(c) status. Community Matters has been selected as the fiscal sponsor. The Memorandum of Understanding is attached for review. Community Matters will receive a 7% administrative fee.

Previous Board History

October 23, 2019 (Item F.4): Report on the formation of the Santa Rosa City Schools' Foundation

August 14, 2019 (Item F.9): Formation of a Santa Rosa City Schools' Foundation

 
Actions:
Motion
Approve the Memorandum of Understanding (MOU) between Santa Rosa City Schools and Community Matters to be the fiscal sponsor for the Santa Rosa Foundation. Passed with a motion by Alegria De La Cruz and a second by Stephanie Manieri.
Vote:
Yes Alegria De La Cruz.
Yes Laurie Fong.
Absent Jenni Klose.
Yes Stephanie Manieri.
Yes Jill McCormick.
Yes Omar Medina.
Absent Ed Sheffield.
Attachments:
1. Community Matters MOU
D.3. (Discussion) Measure I and L General Obligation Bond Program Update
Speaker:
Rick Edson, Deputy Superintendent
Quick Summary / Abstract:

The Board will receive information on the 2014 Measure I (Secondary District) and Measure L (Elementary District) General Obligation Bond Program.

Rationale:

Purpose


In November 2014, Santa Rosa Voters approved two general obligation bond (GOB) measures totaling $229,000,00 to the benefit of Santa Rosa City Schools. Measure I for the City of Santa Rosa High School District authorized $175,000,000 in GOBs and Measure L for the City of Santa Rosa Elementary School District authorized $54,000,000.


This study session is to provide background and process for both bond measures to the Board of Education. At the time of the bond measures passing, only one (1) current Director sat on the Santa Rosa City Schools’ Board of Education. 


With both bond programs approaching 50% of available expenditures, it is time to examine completed projects, current projects, priorities, and potential future projects with the current Board of Education. 


Considerations


History

Prop 39 General Obligation Bonds

A Prop 39 general obligation bond, approved by 55% local vote, authorizes bonds for repair, construction or replacement of school facilities addressing safety, class size, and information technology needs.

Bond proceeds will be repaid from a tax to be levied on the taxable property within the boundaries of the High School District and Elementary School District respectively.  Costs of issuing the bonds will be paid from the proceeds of the bonds and not from the general fund of Santa Rosa City Schools.

November 2014 – Voters of Santa Rosa approve both bond measures

  • Measure I – Secondary District – $175MM (64% Approval)

  • Measure L – Elementary District – $54MM (69% Approval)

Santa Rosa City Schools Bond Program is committed to:

  • Providing a Safe and Modern Learning Environment

  • Current and Reliable Technology and Labs

  • School Repair Measures to Support Student Success

The Bond Measures can be used at our school sites to:

  • Repair or replace leaky roofs

  • Provide updated technology to prepare students for college and careers

  • Repair or replace deteriorating plumbing, sewer, and electrical systems

  • Repair or replace outdated heating, ventilation, and air-conditioning systems

  • Improve access to classrooms and labs for students with disabilities

  • Upgrade campus security, safety, and fire systems at all schools

  • Renovate aging classrooms, science labs, restrooms, and other educational facilities

  • Modernize or replace aging facilities based on programmatic need

Projects at the beginning of the Measure I and L 


After voter approval in November 2014, three projects were moved forward for completion:


  1. Construction and Modernization of the Santa Rosa Charter School for the Arts

    1. This project was in alignment with state funding that provided approximately 45% of the funds necessary for this project.

  2. Technology Projects including:

    1. Network infrastructure including cabling

    2. Wireless access

    3. Student Devices 

    4. Staff Devices

  3. Creation of a Facilities Master Plan


Other projects would be determined after the completion and approval of the Facilities Master Plan.

Preparation for Measure I and L Facilities Projects - Facilities Master Plan

  • To align our overall need and to create a process for identifying areas for bond fund expenditures, SRCS elected to create a comprehensive Facilities Master Plan (FMP). The FMP helps to identify and prioritize the facilities’ needs throughout our school sites.


FMP Process Principles:

  • Transparency: The process, communication, and decision making should be available to all participants.

  • Inclusive and thorough: The process should encourage anyone interested in the process to participate at the appropriate level and should include representatives from throughout all parts of the District. Meetings were conducted bilingually when requested to ensure all could participate.

  • Equity: The same standards, approaches, and practices will be used at each school site so that each school’s facilities are evaluated in the same way and planned to the same standards.


FMP Community Engagement:


  • Site Committee Meetings: Two meetings at each site including teachers, staff, parents, and administrators

  • Educational Facilities Guidelines: Six meetings - 50+ participants representing schools throughout SRCS

  • Student Meetings: Students at each middle school and high school had the opportunity to provide input

  • Community Forums: Six community meetings to review the DRAFT Facilities Master Plan


FMP Approval - April 27, 2016


The development of the Facilities Master Plan allowed the District to engage the SRCS Community in a conversation about the future of our educational facilities. The FMP provides a long term plan for maintaining SRCS school facilities to continue to serve the students, staff, and the community into the future and for improving facilities to better serve the evolving needs of the twenty-first century. As intended, the facilities improvements described go far beyond the scope of Measures I & L. The Indicators of Quality analysis included in the FMP will provide an important metric in the development of the Measures I & L Implementation Plan which will identify which projects will be completed with the available funding. They will also be a tool for determining the best use of any future sources of funding. The FMP is intended to be a living document that will be updated periodically to reflect projects completed, changing conditions and educational priorities. 


FMP Identification of Facilities Needs


Through Facilities Assessments and Site Committee Meetings across Santa Rosa City Schools, a broad range of needs by each facility were identified. Like many Districts in the Bay Area and across California, Santa Rosa City Schools faces a significant need for investment in its school facilities. This need stems from three different circumstances:

  • First, the majority of the District’s facilities were constructed in the 1950s and 1960s and are now 50-60 years old. Many of these facilities were well designed and constructed and can have many years of useful life into the future. However, they require a significant investment in modernization to make sure that they continue to serve the District.

  • Second, there is a significant need across the District to address what we would normally call Deferred Maintenance issues. These are periodic improvements that are needed to replace the equipment, materials, and systems within buildings that need periodic replacement. This includes things like roofing, heating and cooling equipment, lighting, finish materials, paint, paving and other items. Due to the severe budget cuts over the past decade, the state funding for Deferred Maintenance has disappeared at the same time that operational budgets have been reduced. This resulted in the necessary but unfortunate decision to cut maintenance funding and a backlog of these items.

  • Third, there are also a number of facilities improvements needed to address the needs of educational programs. This includes remodeling classrooms and other spaces to make more dynamic, flexible, high-performance learning environments to support the changing pedagogy of education in the twenty-first century. It also includes facilities to meet the needs of specific educational programs such as Full-Service Community Schools, Career Technical Education, Next Generation Science Standards and many others. All of these needs have been evaluated and addressed in this Facilities Master Plan.


Based on the information in the FMP, the following major conclusions were identified:

 

  • There is a significant need for facility improvements across the District and funding those improvements will be an ongoing process for many years to come.


  • There is a significant need for modernization and deferred maintenance across SRCS. This is consistent with other Districts in CA and reflective of the budget and maintenance cuts of the last decade.


  • There are 185 portable classrooms throughout the District which are nearing the end of their service life and need to be replaced, to the extent they are needed, with permanent construction.

  • There is some misalignment of enrollment and facility capacity at the High School level which results in the need for additional classrooms at some schools and excess capacity at others.


  • There are facilities improvements needed to support ongoing and future District programs designed to support student learning including Full-Service Community Schools, Next Generation Science Standards, Career Technical Education, Maker Education, and others.

  • Technology infrastructure and equipment was extremely inadequate at the time of the Facilities Assessment, but the significant improvement has already been made through the work from Measures I & L.


  • The scale of improvements described in the FMP is consistent with facilities needs at similar School Districts in California.


First Issuance of Bond Funds:


In February 2016, SRCS successfully sold Series A Bonds for Measure I and Series A and B for Measure L. These initial bond sales funded initial general expenditures, the initial technology projects and the construction/modernization at Santa Rosa Charter for the Arts.


Amount of Bonds:

  • Measure I Series A: High School District - $12,165,000*

  • Measure L Series A: Elementary School District - $5,700,000^

  • Measure L Series B: Elementary School District - $3,800,000*


*Series A (HS) and Series B (ELEM) – Short term bonds (3-year maturity) for technology projects

^Series A (ELEM) – Conventional Bond (19-year maturity) for facilities projects


As noted previously, the bond programs, with the exception of the Charter for the Arts construction, technology, and the completion of the FMP, waited until sites could be assessed through the creation of the FMP and subsequent implementation plan. Due to the timing of approval of the FMP, large scale projects were not designed and bid during 2016. The first major projects started during the 16-17 school year for construction beginning during the summer of 2017.


Brief Overview of Projects:


2016


  • Santa Rosa Charter School for the Arts Construction/Modernization

  • Technology Projects

    • Teacher Laptops – All sites: Completed 

    • Office computers – Classified staff: Completed 

    • Chrome Books for student use – All sites: Completed 

    • Initial wireless upgrades – All sites: Completed 

    • Core network equipment – District Office: Completed 

    • Data storage and enterprise backup solution: Completed 

    • Network Cabling – All sites (~50% completion)

    • Network Equipment and full wireless implementation – All sites (~50% completion)

    • Increased Internet Capacity - Dark Fiber Applications

  • Facilities Projects

    Summer / Fall 2016 included work to address paving issues, minor site work, and high need roof patching including:

    • Burbank Elementary – Slurry and Striping: Completed 

    • Cook Middle School – Slurry and Striping: Completed 

    • Carrillo High School – Slurry and Striping: Completed 

    • Lehman Elementary – Slurry and Striping: Completed 

    • Hidden Valley Elementary – Slurry and Striping: Completed 

    • Proctor Terrace – Paving work to address drainage issues, Slurry and Striping: Completed 

    • Start of Bathroom Reconditioning Project at High Schools (On-Going)

    • Roof Patches at several sites: Completed 

    • Carrillo Grass Stadium Field Maintenance: Completed 

2017

  • Major Facilities Projects

    • Roofing and HVAC – Piner High: Completed

    • Roofing and HVAC – Biella Elementary: Completed

    • Roofing Slater Middle: Completed

    • Roofing and HVAC – Hidden Valley Elementary: Completed

    • Roofing and HVAC – Monroe Elementary – Portables (Emergency Repair Program): Completed

    • Stadium Field- Maria Carrillo High: In Progress

    • Stadium Lights - Piner High School: In Progress

  • Technology Program Progress

    • Network Cabling: 80% Completed

    • Network Equipment: 80% Completed

    • Phone System: 6 Sites Completed

    • Integrated Bell/Clock/Speaker: 2 Sites Completed

2018

  • Major Facilities Projects:

    • Stadium Track and Field - Maria Carrillo High: Completed

    • Stadium Lights - Piner High School: Completed

    • Roofing and HVAC – Elsie Allen HS: Completed

    • Roofing and HVAC – Maria Carrillo HS: Completed

    • Roofing and HVAC – Santa Rosa HS Phase I: Completed

    • Roofing and HVAC – James Monroe ES: Completed

    • Roofing and HVAC – Hilliard Comstock: Completed

    • Marquees - Biella Elementary: Completed

    • Marquees - Lehman Elementary: Completed

    • Marquees - Lincoln Elementary: Completed

    • Marquees - Monroe Elementary: Completed

    • Marquees - Slater Middle: Completed

    • Classroom Building - Montgomery High: Design Phase

    • Roofing and HVAC – Santa Rosa High Phase II: Design Phase

    • Roofing and HVAC – Montgomery High School: Design Phase

    • Roofing and HVAC – Santa Rosa Middle: Design Phase

    • Roofing and HVAC – Slater Middle: Design Phase

    • Roofing and HVAC – Lincoln Elementary: Design Phase

    • Classroom Safety Locks - Phase I

    • Restroom - Proctor Terrace: Design Phase - Delayed due to Seismic Investigation

    • Outside eating area/fencing - Steele Lane: Design Phase

  • Technology Projects

    • Network Cabling: Completed

    • Dark Fiber for dual Internet Connections: Completed

    • Network Equipment: Completed

    • Integrated Bell/Clock/Speakers: Completed

2019

  • Major Facilities Projects

    • Roofing and HVAC - Slater Middle: In Progress, waiting for Sky Lights to be fabricated. Delayed due to DSA approvals. Roofing and HVAC complete

    • Stadium Track and Field - Santa Rosa High: Completed

    • Stadium Track and Field - Montgomery High: Completed

    • Stadium Track and Field - Piner High: Completed

    • Stadium Track and Field - Elsie Allen High: Completed 

    • Two Story Classroom Building - Montgomery High: Project delayed at DSA due to non-certified legacy projects

    • Roofing and HVAC - Santa Rosa Middle School: Project was delayed at DSA due to complexity and backlog. The project will be bid for Summer 2020. 

    • Roofing and HVAC - Sant Rosa High Phase II: Project delayed at DSA due to non-certified legacy projects

    • Press Box - Maria Carrillo High: Project was delayed at DSA due to non-certified legacy projects. DSA has approved plans and the project will complete in 2020.

    • Marquee - Slater Middle: Completed

    • Roofing and HVAC - Lincoln Elementary: Substantial Completion

    • Restroom - Proctor Terrace: Completed

    • Outside eating area/fencing - Steele Lane: Completed

    • Classroom Safety Locks - Brook Hill Elementary: Completed

    • Classroom Safety Locks - Burbank Elementary: Completed

    • Classroom Safety Locks - Lincoln Elementary: Completed

    • Classroom Safety Locks - Elsie Allen High: Completed

    • Classroom Safety Locks - Slater Middle: Completed

    • Classroom Safety Locks - Montgomery High: Completed

    • Classroom Safety Locks - Piner High: Completed

    • Classroom Safety Locks - Maria Carrillo High: Completed

    • Classroom Safety Locks - Biella Elementary: Completed

    • Classroom Safety Locks - Lehman Elementary: Completed

    • Marquees - Steele Lane Elementary: Completed

    • Marquees - Brook Hill Elementary: Completed

    • Marquees - Burbank Elementary: Completed

    • Classroom Safety Locks - Hidden Valley Elementary: Phase III Scheduled to Start

    • Classroom Safety Locks - Monroe Elementary: Phase III Scheduled to Start

    • Classroom Safety Locks - Steele Lane Elementary: Phase III Scheduled to Start

    • Classroom Safety Locks - Comstock Middle: Phase III Scheduled to Start

    • Classroom Safety Locks - Santa Rosa High: Phase III Scheduled to Start

    • Classroom Safety Locks - Proctor Terrace Elementary: Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - Proctor Terrace Elementary: Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - SR Charter for the Arts: Phase IV Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - SR French American Charter: Phase IV Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - Cook Middle/CCLA: Phase IV Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - Rincon Valley Middle/SRACS: Phase IV Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - Santa Rosa Middle: Phase IV Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - Ridgway High: Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - Lewis Educational Center: Board Approved 11/13/19 Schedule TBD

    • Classroom Safety Locks - District Office: Scheduled after completion of school sites

  • Technology Projects

    • Security Cameras - Montgomery High: Completed

    • Security Cameras - Maria Carrillo High: Completed

    • Security Cameras - Cook Middle/CCLA: Completed

    • Security Cameras - Comstock Middle: Completed

    • Security Cameras - Santa Rosa Middle: Completed

    • Security Cameras - Elsie Allen High: Completed

    • Security Cameras - Rincon Valley Middle/SRACS: Completed

    • Security Cameras - Santa Rosa High: Completed

    • Security Cameras - Lewis Education Center: Completed

    • Security Cameras - Slater Middle: Completed

    • Security Cameras - Ridgway High: Completed

    • Security Cameras - Piner High: Completed

    • Security Cameras - Lincoln Elementary: Completed

    • Security Cameras - Hidden Valley Elementary: Completed

    • Security Cameras - Proctor Terrace Elementary: Completed

    • Security Cameras - Steele Lane Elementary: Completed

    • Security Cameras - Biella Elementary: Completed

    • Security Cameras - Brook Hill Elementary: Completed

    • Security Cameras - Lehman Elementary: Completed

    • Security Cameras - SR Charter for the Arts: Completed

    • Security Cameras - Monroe Elementary: Completed

    • Security Cameras - Burbank Elementary: Completed

Financial Information

Original Budgeted Amounts for Facilities and Technology:

  • Measure I Facilities: $146,000,000

  • Measure I Technology: $29,000,000

    • Total: $175,000,000

  • Measure L Facilities: $41,000,000

  • Measure L Technology: $13,000,000

    • Total: $54,000,000

Total Expenditures to Date (As of 9/30/2019)

  • Measure I: 

    • Disbursed: $77,172,310

    • Encumbered: $85,563,646

    • Remaining: $89,436,354

  • Measure L: 

    • Disbursed: $25,062,294

    • Encumbered: $27,845,452

    • Remaining: $26,154,548

Projects in Process

Measure I:

Projects in progress, design, or waiting on approvals to be bid:

  • Classroom Safety Locks - Remaining Sites: $311,774

  • Classroom Building - Montgomery High(Estimated): $30,000,000

  • Roofing and HVAC - Montgomery High(Estimated): $10,000,000

  • Roofing and HVAC - Santa Rosa High Phase II(Estimated): $7,000,000

  • Roofing and HVAC - Santa Rosa Middle(Estimated): $7,000,000

  • Classroom Technology - All Sites (Estimated): $3,600,000

  • Marquees at remaining sites (Estimated): $125,000

    • Budgeted Funds: $58,036,774

    • Estimated Remaining Funds after Disbursed and Budgeted: $31,399,580

Current Priority of providing Warm/Safe/Dry to remaining school sites focusing on Roofing and HVAC:

  • Estimated Roofing and HVAC at remaining sites: $29,000,000

Measure L:

Projects in progress, design, or waiting on approvals to be bid:

  • Classroom Safety Locks - Remaining Sites: $161,005

  • Classroom Technology - All Sites (Estimated): $2,400,000

  • Marquees at remaining sites (Estimated): $100,000

    • Budgeted Funds: $2,661,005

    • Estimated Remaining Funds after Disbursed and Budgeted: $23,493,543

Current Priority of providing Warm/Safe/Dry to remaining school sites focusing on Roofing and HVAC:

  • Estimated Roofing and HVAC at remaining sites: $27,000,000

Items for Discussion/Considerations:

  • With the creation of the SRCS’ new strategic plan and MVP, is there a need to change priorities from “warm, safe, and dry” and technology.
  • Should school painting, as an identified need, become a current project?
    • Estimated Costs Elementary and Middle Schools: $100,000-$150,000
    • Estimated Cost High Schools: $150,000-$175,000
  • In response to the current state of education should perimeter fencing be installed at our schools?
    • Rod iron Fencing: $125-$135 Linear Foot
    • Coated Chain-link: $55-$65 Linear Foot
    • Example elementary school: $250,000
    • Example middle school: $300,000
    • Example high school: $400,000

Challenges

  • Delayed start of overall Bond Program

  • District Staffing to support the Bond Programs

  • Lack of overall District maintenance of the condition of facilities resulting in higher than anticipated costs

  • Non-Certified DSA projects dating back to the 1990s

  • Contractor Workforce challenges and shortages

  • Most major projects can only be completed during summer non-school window

  • Reduction of staff in Maintenance and Operations in 2008 that has not been fully restored.

  • Lack of adequate funding to address facilities needs

Links

Santa Rosa City Schools’ Facilities Master Plan

Previous Board History

Please note that this list is not exhaustive of all Board meetings where bond information or projects were presented.

August 14, 2019 (Item F.4): Bond Update
August 22, 2018 (Item F.5): Bond Update
December 20, 2017 (Item F.4): Bond Update
March 22, 2017 (Item F.2): Bond Update

 
Minutes:
Staff presented a report on the 2014 Measure I (Secondary District) and Measure L (Elementary District) General Obligation Bond Program.
Jeff Gospe addressed the Board on this item.
Attachments:
1. Measure I and L Implementation Worksheets
2. Measure I Expenditures
3. Measure L Expenditures
E. ADJOURNMENT
Minutes:
The meeting was adjourned at 7:50 p.m.
11/20/2019 3:30:00 PM ( Original )
PresentAlegria De La Cruz
PresentLaurie Fong
AbsentJenni Klose
PresentStephanie Manieri
PresentJill McCormick
PresentOmar Medina
PresentEd Sheffield
11/20/2019 6:00:00 PM
AbsentEd Sheffield
11/20/2019 7:30:00 PM
AbsentOmar Medina

The resubmit was successful.