banner

MEETING FORMAT "B"
Santa Monica-Malibu USD
October 18, 2018 5:30PM
District Administrative Offices: 1651 16th Street, Santa Monica, CA The Board of Education will call the meeting to order at 4:30 p.m. in the Board Conference Room at the District Offices, at which time the Board of Education will move to Closed Session regarding the items listed under Closed Session. The public meeting will reconvene at 5:30 p.m. in the Board Room.

. CLOSED SESSION
Minutes:
Dr. Tahvildaran-Jesswein called closed session to order at 4:30 p.m.
.I. PUBLIC COMMENTS FOR CLOSED SESSION ITEMS ONLY
Quick Summary / Abstract:
Persons wishing to address the Board of Education regarding an item scheduled for closed session must submit the “Request to Address” card prior to the start of closed session.
.II. CLOSED SESSION
.II.A. Government Code §54956.9(d)(1) CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION (15 min)Confidential agenda item.
Quick Summary / Abstract:
  • Name of Case: America Unites for Kids vs. Lyon (C.D. Ca. Sept., 2016), now on appeal to the U.S. Court of Appeals for the Ninth Circuit, America Unites for Kids v. Rousseau, No. 16-56390
.II.B. Government Code §54956.9(d)(2) CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION – SIGNIFICANT EXPOSURE TO LITIGATION (25 min)Confidential agenda item.
Quick Summary / Abstract:
  • 1 case
  • DN-1009-18/19 (Special Education)
.II.C. Government Code §54957 PUBLIC EMPLOYEE DISCIPLINE / DISMISSAL / RELEASE (5 min)Confidential agenda item.
.II.D. Government Code §54957.6 CONFERENCE WITH LABOR NEGOTIATORS (15 min)Confidential agenda item.
Quick Summary / Abstract:
  • Agency Designated Representative: Dr. Ben Drati
  • Employee Organizations: SMMCTA
  • Agency Designated Representative: Dr. Ben Drati
  • Employee Organizations: SEIU
. OPEN SESSION
.I. CALL TO ORDER
Minutes:
Dr. Tahvildaran-Jesswein called open session to order at 5:43 p.m.
.I.A. Roll Call
Minutes:
Present Oscar de la Torre – arrived at 4:50 p.m.
Present Craig Foster
Present Jon Kean
Present Maria Leon-Vazquez – arrived at 4:45 p.m.
Present Laurie Lieberman
Present Ralph Mechur
Present Dr. Richard Tahvildaran-Jesswein
.I.B. Pledge of Allegiance
Minutes:
Fifth grader Asha Hudson led the Pledge of Allegiance.
.II. APPROVAL OF THE AGENDA
Recommended Motion:

It is recommended that the Board of Education approve the October 18, 2018, regular meeting agenda.  

Actions:
Motion

It is recommended that the Board of Education approve the October 18, 2018, regular meeting agenda.  

Passed with a motion by Mr. Oscar de la Torre and a second by Mr. Craig Foster.
Vote:
Yes Mr. Oscar de la Torre.
Yes Mr. Craig Foster.
Yes Mr. Jon Kean.
Yes Ms. Maria Leon-Vazquez.
Yes Ms. Laurie Lieberman.
Yes Mr. Ralph Mechur.
Yes Dr. Richard Tahvildaran-Jesswein.
.III. APPROVAL OF MINUTES
.III.A. Approve October 4, 2018, Minutes
Recommended Motion:

It is recommended that the Board of Education approve the October 4, 2018, regular meeting minutes.  

Actions:
Motion

It is recommended that the Board of Education approve the October 4, 2018, regular meeting minutes.  

Passed with a motion by Mr. Craig Foster and a second by Mr. Oscar de la Torre.
Vote:
Yes Mr. Oscar de la Torre.
Yes Mr. Craig Foster.
Yes Mr. Jon Kean.
Yes Ms. Maria Leon-Vazquez.
Yes Ms. Laurie Lieberman.
Yes Mr. Ralph Mechur.
Yes Dr. Richard Tahvildaran-Jesswein.
Attachments:
Minutes_100418
.IV. BOARD OF EDUCATION – COMMENDATIONS/RECOGNITIONS
.IV.A. National Hispanic/Latino Heritage Month Celebration (10 min)
Minutes:
Time start: 5:45 p.m. Time end: 6:13 p.m.

Edison Principal Lori Orum introduced P.S. teacher Martha Ramirez-Oropeza and Mr. Marquez, who summarized the mission, demographics, and cultures of Edison Language Academy. Third graders demonstrated their Dia de Los Muertos performance, which they learned through the P.S. Arts program.
.V. SUPERINTENDENT'S REPORT
Minutes:
Time start: 6:13 p.m. Time end: 6:16 p.m.

Dr. Drati reported that every school and the district office participated in the CA Great Shakeout this morning. It was an opportunity for everyone to practice their emergency response protocols. Dr. Drati reported that three of our Malibu schools, one of our Santa Monica schools, and the district office experienced a power outage earlier this week due to high winds. He thanked the City of Malibu staff for working the situation with us. He said the school staff handled the situation well. We learned of some telecommunication problems that we will address. Dr. Drati reported that fourteen teachers are participating with administrators to learn more about project-based learning. They will be experiencing trainings throughout the year to learn how to design lessons around PBL. He also reported that two cohorts of teachers and administrators are learning about social justice standards.
.VI. CONSENT CALENDAR
Actions:
Motion
Passed with a motion by Mr. Craig Foster and a second by Ms. Laurie Lieberman.
Vote:
Yes Mr. Oscar de la Torre.
Yes Mr. Craig Foster.
Yes Mr. Jon Kean.
Yes Ms. Maria Leon-Vazquez.
Yes Ms. Laurie Lieberman.
Yes Mr. Ralph Mechur.
Yes Dr. Richard Tahvildaran-Jesswein.
Quick Summary / Abstract:
As agreed by the President, Vice President, and Superintendent during agenda planning, consent agenda items are considered routine, require no discussion, and are normally approved all at once by the Board of Education. However, members of the Board of Education, staff, or the public may request an item be moved from the consent agenda to Section XI (Major Items) for clarification and/or discussion.
Minutes:
The board approved Item Nos. A.2-3, B.2-3, C.1-16, and D.1-7 listed under the Consent Calendar. The board pulled Item No. A.1 and voted on it separately.

Time start: 6:16 p.m. Time end: 6:17 p.m.
.VI.A. Curriculum and Instruction
.VI.A.1. Approval of Independent Contractors
Recommended Motion:

It is recommended that the Board of Education enter into an agreement with the following Independent Contractors.  

Actions:
Motion

It is recommended that the Board of Education enter into an agreement with the following Independent Contractors.  

Passed with a motion by Mr. Jon Kean and a second by Mr. Craig Foster.
Vote:
Yes Mr. Oscar de la Torre.
Yes Mr. Craig Foster.
Yes Mr. Jon Kean.
Abstain Ms. Maria Leon-Vazquez.
Yes Ms. Laurie Lieberman.
Yes Mr. Ralph Mechur.
Abstain Dr. Richard Tahvildaran-Jesswein.
Financial Impact:
  • Contractor: Illuminate Education       
  • Date: 10/09/18-06/30/19
  • Amount not to exceed: $10,000.00
  • Description: Provide training for teachers on the Illuminate platform in order to build assessments aligned to curriculum guides.  
  • Site: Educational Services
  • Funding: 01-00030-0-11100-10000-5802-030-1300


  • Contractor: Eric Hall & Associates
  • Dates: 07/20/18–02/02/19
  • Amount not to exceed: $25,000.00
  • Description: Facility Improvement Projects Department Review
  • Site: Business Services
  • Funding: 01-00000-0-00000-73000-5802-050-1500
  • (Amend contract funding. Original contract approved on 07/19/18 Item VIII.C.1.)


  • Contractor: JUST COMMUNITIES
  • Dates: 09/21/18-06/30/19
  • Amount not to exceed: $13,000.00 $19,004.00
  • Description:  In response to a request from parents, Just Communities will provide a customized Parents for Inclusion, Diversity and Access (PIDA) program. PIDA is designed to develop a core group of parent leaders with the knowledge, skills and tools they need to work with school and district leaders to promote educational equity and address academic opportunity and achievement gaps. The goal of this customized PIDA program is to help SMMSD develop and formalize a parent advisory group through a parent-led, parent-owned process. (Additional services provided include interpretation at each of the PIDA meetings and one parent orientation meeting.)
  • Site: Educational Services
  • Funding: 01-00030-0-19200-24950-5802-030-1300
  • (Amend amount not to exceed and description of services. Original contract approved on 09/20/18)


  • Contractor: Accommodating Ideas
  • Dates: 10/19/18–06/30/19
  • Amount not to exceed: $4,000.00
  • Description:  In order to address Language Access needs for district-wide meetings (I.e. DELAC, LCAP PAC, Parent Workshops), the interpretation services are being requested.
  • Site: Educational Services
  • Funding: 01-00030-0-19200-24950-5802-030-1300


  • Contractor:  Cristina Stephany, Ed.D.
  • Dates: 10/15/18–6/30/19
  • Amount not to exceed:  $5,000.00
  • Description: Staff consultant to create and review formative assessment to guide instruction.
  • Site: Malibu High School
  • Funding:  01-00030-0-11100-10000-5802-030-1300


  • Contractor:  Digital Dragon
  • Dates: 08/27/18-06/12/19
  • Amount not to exceed:  $28,000.00
  • Description:  JAMS-Computer Science-App Academy elective Aug 2018-June 2019; 72 classes, 2x-90 minutes of Professional Development
  • Site:  John Adams MS
  • Funding: 01-00021-0-11100-10000-5802-011-4110 (SMMEF Stretch Grant)


  • Contractor:  Theatre 31
  • Dates: 12/01/18-05/1/19
  • Amount not to exceed: $22,000.00
  • Description: Provide after-school Theatre/Drama Program two to three days /week including a culminating performance event at the end of the program
  • Site: John Adams MS
  • Funding: 01-90810-0-11100-10000-5802-011-4110—$7,500.00 (SM Ed Foundation); 01-90150-0-11100-10000-5802-011-4110—$13,500.00 (JAMS PTSA); 01-90150-0-31000-10000-5802-009-4090—$1,000.00 (SMASH PTSA)


  • Contractor: Santa Monica College Dance Department, Judith Douglas
  • Dates: 10/08/18-05/31/19
  • Amount not to exceed: $55,000.00
  • Description: SMC dance faculty will provide the 5th grade students at all school sites Ballroom Dance classes on 5 dances: Merengue, Fox Trot, Tango, Swing, and Waltz  with twenty lessons over the course of 10 weeks.
  • Site: Educational Services     
  • Funding: 01-00020-0-17000-10000-5802-030-1300


  • Contractor: Santa Monica College Dance Department, Judith Douglas
  • Dates: 11/01/18-11/30/18
  • Amount not to exceed: $16,000.00
  • Description: SMC Dance Faculty will provide instruction to the 4th grade students  at all school sites through its SMC Dance Academy.  The 4th grade curriculum consists of four lessons in selected dance genres of African Dance, Mexican Dance and/or Hawaiian Dance.  The dance curriculum is aligned with the college mission on Global Citizenship and is standards-based.
  • Site: Educational Services     
  • Funding: 01-00001-0-17150-10000-5802-030-1300
Comments:

These contracts are included in the 2018-19 budget. 

Minutes:
Time start: 6:17 p.m. Time end: 6:18 p.m.

Dr. Tahvildaran-Jesswein and Ms. Leon-Vazquez recused themselves, as they work for Santa Monica College, a vendor listed in this item.
.VI.A.2. Conference & Travel Approval/Ratification - 2018/2019
Recommended Motion:

It is recommended that the Board of Education approve/ratify the attached Requests for Absence on District Business (Conference and Travel) forms.

Financial Impact:

The average cost for substitute teachers is $183/day. This figure is furnished for informational purposes and does not reflect the actual amount paid for an individual substitute.

Attachments:
C & T 10/18/18
.VI.A.3. Overnight Field Trip(s) 2018-19
Recommended Motion:

It is recommended that the Board of Education approve the special field trip(s) listed below for students for the 2018-2019 school year.  

Financial Impact:
  • School: John Adams Middle School
  • Grade: 6th 
  • # of Students: 250  
  • Destination: Catalina - Toyon Bay, Catalina
  • Dates: 10/26/18-10/28/18
  • Principal/Teacher: S.Richardson/T.Levin
  • Cost & Funding Source: $335 per student paid by parents & fundraising
  • Subject: Science
  • Purpose: Students will participate in a camp focusing on hands-on experimental science dealing with natural land and sea environments.


  • School: Santa Monica High School
  • Grade: 9th-12th
  • # of Students:  87
  • Destination: San Francisco, CA
  • Dates: 02/21/19–02/24/19
  • Principal/Teacher: A.Shelton/J.Aiello
  • Cost & Funding Source: $600 per student / Fundraising & parent donations
  • Subject:  Music
  • Purpose: Philharmonic Orchestra will participate in music clinics, perform in a concert exchange, and visit local colleges


  • School: Santa Monica High School
  • Grade: 9th-12th
  • # of Students:  18       
  • Destination: New York, New York
  • Dates: 03/06/19–03/10/19
  • Principal/Teacher: A.Shelton/J.Swenson
  • Cost & Funding Source: $1,900 per student / Fundraising & parent donations
  • Subject: Music
  • Purpose: Chamber Orchestra will compete in National Orchestra Cup at Alice Tully Hall in Lincoln Center


  • School: Franklin
  • Grade: 5th
  • # of Students: 140      
  • Destination: Pali Camp, Running Springs, CA
  • Dates: 04/01/19-04/03/19
  • Principal/Teacher: D.Sinfield/L.Hampton/E.Powell/D.Silhavy/J.Gonzalez
  • Cost & Funding Source: $39,150.00 Paid through parent donations and fundraising
  • Subject: Science
  • Purpose: Outdoor science camp for all our 5th grade students


  • School: Edison Language Academy
  • Grade: 5th
  • # of Students: 72        
  • Destination: Pali Camp, Running Springs, CA
  • Dates: 04/22/19-04/24/19
  • Principal/Teacher: L.Orum/M.Constanza/C.Morales/R.Naranjo
  • Cost & Funding Source: $300.00 per student paid by parents & fundraising
  • Subject: Science
  • Purpose: Outdoor Education Program
Comments:

No child will be denied due to financial hardship. 


.VI.A.4. Special Education Contracts
Recommended Motion:

It is recommended that the Board of Education approve the attached Special Education contracts for fiscal year 2018/2019.

Rationale:

According to the Education Code SEC.21 Section 56342, prior to recommending a new or continued placement in a non-public, non-sectarian school, the individualized Education Program (IEP) Team must submit the proposed recommendation to the local governing board for its review and recommendation regarding the cost of such placement.

The recommendations for these severely handicapped students are made by the District IEP Teams in accordance with State and Federal laws.  The mandates of IDEA require non-public school services be provided at no expense to parents if there is not an appropriate public school program available.  Funding to come from a SELPA-wide non-public school/non-public agency reserve account.

 
Attachments:
Special Education Contracts 18/19
.VI.B. Business and Fiscal
.VI.B.1. Award of Purchase Orders
Recommended Motion:

It is recommended that the Board of Education approve the following Purchase Orders and Changed Purchase Orders form September 26, 2018, through October 9, 2018, for fiscal /19. 

Attachments:
Purchase Order List
.VI.B.2. Acceptance of Gifts- 2018/2019
Recommended Motion:

It is recommended that the Board of Education accept, with gratitude, checks totaling $51,549.84 presented to the Santa Monica-Malibu Unified School District.

It is further recommended that the Fiscal/Business Services Office, in accordance with Educational Code §42602, be authorized to increase the 2018-2019 income and appropriations by $51,549.84 as described on the attached listing.

Rationale:

This report details only cash gifts.  It includes all contributions made by individuals or companies and some of the contributions made by our PTA’s.  Contributions made by a PTA in the form of a commitment and then billed are reported in a different resource.  A final report that compiles all gift and PTA contributions is prepared and available annually.

 COMMENT:   The value of all non-cash gifts has been determined by the donors.

 NOTE:            The list of gifts is available on the District’s website, www.smmusd.org.

 
Attachments:
Gift Report 10/18/18
.VI.C. Facilities Improvement Projects
.VI.C.1. Change Order #01 –John Adams Middle School – Athletic Field Replacement Project – FieldTurf USA, Inc. - Measure ES
Recommended Motion:
It is recommended that the Board of Education approve Change Order #01 with FieldTurf USA, Inc. for the John Adams Middle School – Athletic Field Replacement Project – Removal & Replacement of the Turf Field in the credit amount of ($24,750.00) for a total contract amount of $1,777,849.87 and 5 days of schedule impact.
Rationale:

On February 15, 2018 the Santa Monica Malibu Unified School District’s Board of Education awarded to FieldTurf USA, INC. the construction contract using CMAS contract #4-06-78-0031A for the John Adams Middle School - Athletic Field Replacement Project in the amount of $1,802,599.87.

Notice to Proceed was given on June 9, 2018.

The changes for this Change Order #01 include: A credit for not using 2,200 LF of pressure treated header.

Change Order No. #01 includes a 5 day increase to the contract time in order to interface with the added softball field work.

 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 87
  • Source: Measure ES
  • Account Number: 87-90907-0-00000-85000-6200-011-2600
  • Budget Category: Hard Costs \Construction Contracts

MEASURE ES FUNDING

  • Original Contract: $1,802,599.87
  • Change Order #01: $ -24,750.00                        
  • TOTAL CONTRACT AMOUNT: $1,777,849.87
.VI.C.2. Change Order #01 – John Adams Middle School – Athletic Field Replacement Project - Softball Field Replacement – FieldTurf USA, Inc. - Measure ES
Recommended Motion:

It is recommended that the Board of Education approve Change Order #01 with FieldTurf USA, Inc. for the John Adams Middle School – Athletic Field Replacement Project - Softball Field Replacement in the added amount of $12,812.88 for a total contract amount of $272,654.06 and 5 days of schedule impact.

Rationale:

On May 17, 2018 the Santa Monica Malibu Unified School District’s Board of Education awarded to FieldTurf USA, INC. the construction contract using CMAS Contract # 4-06-78-0031A for the John Adams Middle School - Athletic Field Replacement Project – Softball Field Replacement in the amount of $259,841.18.

Notice to proceed was given on June 9, 2018.

The changes for this Change Order #01 includes: (1) Removal of unforeseen concrete curb at perimeter of softball infield. (2) Add for removable home plate and pitcher’s rubber with sleeves set in concrete installed. (3) Add concrete along the west fence line between the fence and the Boys & Girls Club parking header wall. (4) Add (3) sets Pro in ground pitching Rubber and (9) Mac orange rubber anchor plugs.

Change Order No. #01 includes a 5-day increase to the contract time in order to interface with the Athletic Field Replacement Project.

 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 87
  • Source: Measure ES
  • Account Number: 87-90907-0-00000-85000-6200-011-2600
  • Budget Category: Building and Building Improvement

MEASURE ES FUNDING

  • Original Contract: $259,841.18
  • Change Order #01: $12,812.88                      
  • TOTAL CONTRACT AMOUNT: $272,654.06
.VI.C.3. Change Order #03 – Lincoln Middle School – Field Replacement Project – Construction Contract Bid #17.13.ES.R1 – Angeles Contractor, Inc.– Measure ES
Recommended Motion:

It is recommended that the Board of Education approve Change Order #03 with Angeles Contractor, Inc. for the Lincoln Middle School - Field Replacement Project for a credit in the amount of ($73,747.48) which will reduce the total approved contract amount to $4,048,702.23. 

Rationale:

At the June 29, 2017, Santa Monica Malibu Unified School District Board of Education Meeting, the contract for the Lincoln Middle School Field Replacement Project was awarded to Angeles Contractor, Inc. in the amount of $4,092,000.00.  Two change orders, totaling $30,449.69, were subsequently approved and increased the contract amount to $4,122,449.69.

Included in the original $4,092,000.00 contract amount was an allowance of $100,000.00 to pay for minor changes to the Work as required and approved by the Project Manager.  Only $26,252.54 of the allowance was expended during the project.  As the Work of the project is substantially complete and all proposed change orders from the Contractor resolved, $73,747.46 of the allowance remains unused.  This change order will credit the ($73,747.46) of unused allowance from the approved contract amount.

 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 85
  • Source: Measure ES
  • Account Number: 85-90908-0-00000-85000-6200-012-2600
  • Budget Category: Construction Contracts
  • DSA #: 03-117787

MEASURE ES FUNDING:

  • ORIGINAL CONTRACT AMOUNT - $4,092,000.00
  • CHANGE ORDER NO. 1 - $97,740.69
  • CHANGE ORDER NO. 2 - ($67,291.00)
  • CHANGE ORDER NO. 3 - ($73,747.46)            
  • TOTAL CONTRACT AMOUNT:  $4,048,702.23
.VI.C.4. Change Order #04 – Olympic High School - Campus Modernization Project - SimplexGrinnell -Measure BB
Recommended Motion:

It is recommended that the Board of Education approve Change Order #04 with Simplex-Grinnell for the Olympic High School – Campus Modernization Project in an amount not to exceed $29,268.60 for a total contract amount of $533,895.87. 

Rationale:

During construction a number of modifications and additions to the project work were performed due to unforeseen conditions and changed scope of work.  This Change Order includes costs for both Simplex-Grinnell and its subcontractor to provide Labor and materials to install additional fire alarm devices at the Olympic HS Building A and Pine St CDS portable D.

 
Financial Impact:

Funding Information

  • Budgeted: No
  • Fund: 83
  • Source: Measure BB
  • Account Numbers: 83-90500-0-00000-85000-6200-014-2600
  • Budget Category: Construction Hard Costs
  • DSA #: 03-113343

MEASURE BB FUNDING

  • ORIGINAL CONTRACT - Olympic – New Fire Alarm Installation: $405,946.73
  • CHANGE ORDER #01: $73,191.29
  • CHANGE ORDER #02: $2,919.21
  • CHANGE ORDER #03: $22,570.04
  • CHANGE ORDER #04: $29,268.60 
  • TOTAL CONTRACT: $533,895.87
.VI.C.5. Change Order #05 to Agreement – Santa Monica High School – Discovery Building Project – Demolition of Science and Technology Buildings – Construction Contract Bid #18.13.ES - Ampco Contracting - Measure ES
Recommended Motion:

It is recommended that the Board of Education approve Change Order #05 with Ampco Contracting for the Santa Monica High School – Discovery Building Project – Demolition of Science and Technology Buildings, for: Installing fencing at the Michigan gate; installing an additional sewer manhole in the Science Quad; and disposing of unforeseen mesh reinforced concrete, in the total amount of $57,168.43 for a total contract amount $ 4,730,460.88 with 1-day impact to the schedule.

Rationale:

On May 3, 2018, the Board awarded to Ampco Contracting, the abatement contract for the Science and Technology Buildings as the first phase of the preparation for the construction of the new Discovery Building, in the amount of $3,954,000.00.

The following additional unforeseen conditions were encountered:

  • The installation of fencing and gates in the ROW, outside the Michigan gates to provide pedestrian access in a contained environment around the construction area, outside the school’s perimeter fencing. This was to have been included in the construction of the Discovery Building phase, but made more sense to include it in this 1st phase of the work
  • The installation of an additional sewer manhole in the Science Quad at the intersection of the existing sewer line and the new sewer. This allowed for the reopening of the Science quad in August before the completion of the new sewer line, scheduled for 10/12/18, is completed
  • The disposal of the unforeseen mesh reinforced concrete, from the entire floor slab of the Technology building. It was expected that the floor slab would be reinforced concrete with regular rebar, which can be separated from concrete rubble, unlike mesh reinforcement.    
 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 85
  • Source: Measure ES
  • Account Number: 85-90904-0-00000-85000-6200-015-2600
  • Budget Category: Hard Costs \ Construction Contracts

MEASURE ES FUNDING:   

  • ORIGINAL CONTRACT: $3,954,000.00
  • CHANGE ORDER #01 - Abatement of Technology Building: $394,063.43
  • CHANGE ORDER #02 - Relocation of trees: $36,120.00
  • CHANGE ORDER #03 - Relocation of trees: $63,303.02
  • CHANGE ORDER #04 - Move trees, electrical breakers and haz waste: $225,806.00
  • CHANGE ORDER #05 - New Fencing, Sc Quad sewer MH, Michigan fence: $57,168.43
  • TOTAL CONTRACT AMOUNT: $4,730,460.88                   
.VI.C.6. Change Order #03 – Webster Elementary School – Safety Project – Construction Contract – Bid #18.10.BBWaisman Construction, Inc. - Measure BB
Recommended Motion:

It is recommended that the Board of Education approve Change Order #03 with Waisman Construction, Inc. for the Webster Elementary School – Safety Project in an amount of $88,331.15 for a total contract amount of $3,401,357.59 and 0 days of schedule impact.

Rationale:

On April 12, 2017, the Santa Monica Malibu Unified School District’s Board of Education

awarded to Waisman Construction, Inc. the construction contract for the Webster Elementary School – Safety Project in the amount of $ 3,207,665.00.

Notice to proceed was given on June 19, 2018. 

The changes for this Change Order #03 include: Credit for the deletion of scope for wrought iron gates; Revision to chain link gates and changes to the hand rail and guard rail at various locations in the new work; Reimbursing cost to the Contractor for District hired material testing lab errors; Provide and install additional work at the North Playfield area per District’s request; Rerouting the gas line to the campus; Demolish and remove off-site existing underground unknown utilities; Rework for curbs at the play structure behind the Boys & Girls Club to meet fall zone requirement for the structure; Compensate Contractor per District agreement to pick up the delta for the Saturday and Sunday overtime work to make portions of work ready before the school opening and other miscellaneous field changes needed to accomplish the new scope of work on the project.

This Change Order No. #03 is necessary to reimburse Waisman Construction for the added cost of Constructing Webster Elementary School – Safety Project contract.

Change Order No. #03 includes a 0 day increase to the contract time and funding is from Program Reserve shortages.

 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 83
  • Source: Measure BB
  • Account Number: 83-90500-0-00000-85000-6200-008-2600
  • Budget Category: Hard Costs \ Construction Contracts
  • DSA #: 03-118507

MEASURE ES FUNDING

  • Original Contract: $3,207,665.00
  • Change Order #01: $49,661.54
  • Change Order #02: $55,699.90
  • Change Order #03: $88,331.15                         
  • TOTAL CONTRACT AMOUNT: $3,401,357.59
.VI.C.7. Change Order #03 – Webster Elementary School – Window, Paint, Floors & Doors Project– Construction Contract Bid # 17.10.ES – Angeles Contractor Inc. – Measure ES
Recommended Motion:

It is recommended that the Board of Education approve Change Order #03 with Angeles Contractor Inc. for the Webster Elementary School – Window, Paint, Floors & Doors Project for no cost for a total contract amount of $2,693.845.77 and 166 days of no cost time extension. 

Rationale:

On April 24, 2017, the Santa Monica Malibu Unified School District’s Board of Education

awarded to Angeles Contractor Inc. the construction contract for the Webster Elementary School – Windows, Paint, Floors and Doors Project in the amount of $2,690,000.00.

Notice to proceed was given on May 09, 2017.

The changes for this Change Order #03 is for a no cost time extension of 166 days to repair unforeseen termite damage in buildings D and F and reroute unforeseen utilities under the restroom floor slabs in buildings B, D and G, as described in Change Orders 1 and 2 which only reconciled the cost and not the time impact. These unforeseen delays ran concurrent with the Contractors delays, as they were not able to staff the project and coordinate their contract work effectively. The combined effect of these concurrent delays pushed the schedule for the last two buildings A and C to be phased separately during the school year and were only actually completed on 1/29/18.

This Change Order No. 03 is necessary to reconcile the contract time Angeles Contractor Inc. in order to complete the construction of Webster Elementary School - Windows, Paint, Floors and Doors Project contract.

Change Order No. 03 includes a 166 day no cost time increase in the contract time.
 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 85
  • Source: Measure ES
  • Account Number: 85-90905-0-00000-85000-5640-008-2600
  • Budget Category: Hard Costs \ Construction Contracts
  • DSA #: 03-117627

MEASURE ES FUNDING

  • Original Contract: $2,690,000.00
  • Change Order #01: $68,061.05
  • Change Order #02: ($64,215.28)
  • Change Order #03: $0.00                                  
  • TOTAL CONTRACT AMOUNT: $2,693,845.77
.VI.C.8. Amendment #04 to Agreement – McKinley Elementary School – Window, Paint, Floors & Doors Project and HVAC Project – Architectural Services – Rachlin Partners – Measure ES
Recommended Motion:

It is recommended that the Board of Education approve Contract Amendment #04 with Rachlin Partners for additional architectural and engineering services for McKinley Elementary School -Window, Paint, Floors & Doors Project and HVAC Project in an amount not to exceed $10,540.00 for a total contract amount of $637,645.00. 

Rationale:

Rachlin Partners are providing architectural design services for the Windows Paint, Floors, Doors and HVAC project at McKinley ES. They have been asked to provide schematic drawings and a cost estimate to determine the feasibility of requested revisions as follows:

To convert the existing school library to science classroom. Classroom to accommodate 32 students with flexible furniture, mobile teaching station, casework and 3 sinks and connection to outdoor area.

To convert the existing kindergarten classroom into library including providing a covered outdoor seating area and link to the interior space.

 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 85
  • Source: Measure ES
  • Account Number85-90905-0-00000-85000-5802-004-2600
  • Budget Category: Soft Costs/Design Services/Architects

MEASURE ES FUNDING:

  • Original Agreement: $347,500.00
  • Contract Amendment #1 – HVAC & ADA Adds: $241,200.00
  • Contract Amendment #2 – survey & air balance: $25,685.00
  • Contract Amendment #3 – additional design services $12,720.00
  • Contract Amendment #4 – additional design services $10,540.00 
  • Total Contract Amount: $637,645.00
.VI.C.9. Amendment #60 to Agreement – Malibu Middle & High School – Campus Improvements Project - Architectural Services - HMC Architects – Measure BB
Recommended Motion:

It is recommended that the Board of Education approve Contract Amendment #60 with HMC Architects to include the cost of additional architectural and engineering design services related to two items. The cost of this amendment is $204,607.00 for a total contract amount of $9,718,642.50.

Rationale:

Contract Amendment #60 will cover the cost of additional architectural and engineering design services related to two items:

  • Item #1 includes architectural construction administration services related to changes in the phasing and scheduling of the project as well as a supplement to the staffing levels at the site designed to expedite processing of design related issues that arise during construction.
  • Item #2 includes design services related to the replacement of the scoreboard at the Malibu High School Football Field and associated ADA accessibility improvements. The cost of this item is $20,800.00.

The total cost of this contract amendment is $204,607.00

 
Financial Impact:

Funding Information

  • Budgeted: No
  • Fund: 83
  • Source: Measure BB
  • Account Number: 83-90500-0-00000-85000-5802-008-2600
  • Budget Category: Soft Costs \ Design Services \ Architects

MEASURE BB:

  • ORIGINAL CONTRACT AMOUNT - MMHS, Prog./Schematic Design: $961,327
  • CONTRACT AMENDMENT #1 - Cabrillo, SDC-IS: $87,995
  • CONTRACT AMENDMENT #2 - MMHS, FF&E Standards: $92,400
  • CONTRACT AMENDMENT #3 - MMHS, DD/CD/CA: $3,562,894
  • CONTRACT AMENDMENT #4 - Pt. Dume/Webster Safety: $157,588
  • CONTRACT AMENDMENT #5 - MMHS, Public Meetings/EIR: $25,144
  • CONTRACT AMENDMENT #6 - Cabrillo, Safety Project: $10,304
  • CONTRACT AMENDMENT #7 - Webster, Parking Safety Project: $62,344
  • CONTRACT AMENDMENT #8 - Cabrillo, Septic Study: $21,647
  • CONTRACT AMENDMENT #9 - MMHS, Right turn lane study: $68,256
  • CONTRACT AMENDMENT #10 - MMHS, Fire protection: $25,991
  • CONTRACT AMENDMENT #11 - MMHS, Field renderings: $8,046
  • CONTRACT AMENDMENT #12 - MMHS, Wastewater study: $62,037
  • CONTRACT AMENDMENT #13 - MMHS, Electrical: $34,428
  • CONTRACT AMENDMENT #14 - MMHS, EIR, Traffic, Parking: $372,321
  • CONTRACT AMENDMENT #15 - Webster Fire alarm: $9,090
  • CONTRACT AMENDMENT #16 - MMHS, Additional Scope: $228,405
  • CONTRACT AMENDMENT #17 - Malibu, Parking Lot “A”: $57,340
  • CONTRACT AMENDMENT #18 - Cabrillo, Additional scope: $9,690
  • CONTRACT AMENDMENT #19 - OWTS, Webster: $57,330
  • CONTRACT AMENDMENT #20 - OWTS, Pt. Dume: $57,330.00
  • CONTRACT AMENDMENT #21 - MMHS, OWTS Const. Doc’s & CA: $245,375.00
  • CONTRACT AMENDMENT #22 - Point Dume, Struct. invest. & design: $19,840.00
  • CONTRACT AMENDMENT #23 - MMHS, CDP Exempt. and Waivers: $12,520.00
  • CONTRACT AMENDMENT #24 - Cabrillo, DSA submittal Fencing: $3,700.00
  • CONTRACT AMENDMENT #25 - MMHS, FA into sep. DSA & Bid Pkg: $69,210.00
  • CONTRACT AMENDMENT #26 - MMHS Fence/Gates, Erosion Control: $83,090.00
  • CONTRACT AMENDMENT #27 - Cabrillo, Fencing & gate revisions: $7,065.00
  • CONTRACT AMENDMENT #28 - Webster, Parking and Drop-Off: $73,280.00
  • CONTRACT AMENDMENT #29 - Malibu, Campus Improvement: $8,000.00
  • CONTRACT AMENDMENT #30 - MMHS, EIR lighting study: $4,500.00
  • CONTRACT AMENDMENT #32 - MMHS, RWQCB, WDRs: $6,200.00
  • CONTRACT AMENDMENT #33 - MMHS HS, Fire Alarm, FCD: $7,315.00
  • CONTRACT AMENDMENT #34 - MMHSHS, SWPPP: $5,800.00
  • CONTRACT AMENDMENT #36 - MMHS, CDP, Hearing, redesign: $350,000.00
  • CONTRACT AMENDMENT #37 - MMHS, Redesign, OWTS Redesign: $444,444.00
  • CONTRACT AMENDMENT #38 - MMHS, Pkg Lot Photo Renderings: $44,345.00
  • CONTRACT AMENDMENT #39 - MMHS, Wharf and Pkg Lot E Design: $496,000.00
  • CONTRACT AMENDMENT #40 - MMHS, Pkg lot/ESHA Light Meter: $14,000.00
  • CONTRACT AMENDMENT #41 - MMHS, Bldg E: $193,097.00
  • CONTRACT AMENDMENT #42 - MMHS Building E Replacement: $108,500.00
  • CONTRACT AMENDMENT #43 - MMHS Building E Exterior Upgrades: $88,454.00
  • CONTRACT AMENDMENT #44 - MMHS Native Tree Monitoring Rpt.: $4,500.00
  • CONTRACT AMENDMENT #45 - MMHS SWPPP & Waste Water: $158,764.00
  • CONTRACT AMENDMENT #46 - MMHS Air Cond. & MDF Mig. Plan: $183,700.00
  • CONTRACT AMENDMENT #47 - MMHS Feasibility Std and CDP App: $58,350.00
  • CONTRACT AMENDMENT #48 - MMHS Growthpoint Renderings: $6,187.00
  • CONTRACT AMENDMENT #49 - MMHS Design Updates and Bid Sets: $462,801.00
  • CONTRACT AMENDMENT #50 - MMHS Peer Review - Outdoor Lights: $5,036.50.00
  • CONTRACT AMENDMENT #51 - MMHS Traffic Control: $18,510.00
  • CONTRACT AMENDMENT #52 - Webster Drop Off /Parking Lot Update: $170,290.00
  • CONTRACT AMENDMENT #53 – MMHS Reimbursables: $25,000.00
  • CONTRACT AMENDMENT #54 – Webster Elec Reloc and Lighting Conduit: $17,375.00
  • CONTRACT AMENDMENT #55 – MMHS IT Office, Onsite Soil Study, Fire Lane: $44,985.00
  • CONTRACT AMENDMENT #56 – MMHS Off-Site Permit Requirements: $31,075.00
  • CONTRACT AMENDMENT #57 – Webster Hydrology and Rebidding: $20,500.00
  • CONTRACT AMENDMENT #58 – Webster CCD to extend AC playground: $7,490.00
  • CONTRACT AMENDMENT #59 – MMHS Fiber Optic Infrastructure: $42,830.00
  • CONTRACT AMENDMENT #60 – MMHS Extended CA and Scoreboard Replacement: $204,607.00
  • TOTAL CONTRACT AMOUNT: $9,718,642.50         

Malibu Stadium Lighting:

  • CONTRACT AMENDMENT #31 - MMHS, Stdm Lights, Architect Svcs.: $56,260.00
  • CONTRACT AMENDMENT #35 - MMHS, Stdm Lights, Architect Svcs.: $12,795.00
  • TOTAL AMOUNT: $69,055.00

This CA will be funded from Program Reserve Shortages.

.VI.C.10. Award of Agreement – Malibu Middle & High School – Campus Improvements Project – FF&E Design Services - Pacific Office Interiors (POI) – Measure BB
Recommended Motion:

It is recommended that the Board of Education award an agreement for FF&E Design Services to Pacific Office Interiors (POI) for Malibu Middle & High School – Campus Improvements Project in an amount not to exceed $8,840.00.

Rationale:

The District requested a proposal from Pacific Office Interiors (POI) to provide the FF&E design services as they are not part of HMC’s Architectural contract. POI’s proposed price for this work is $8,840.00. POI will provide the FF&E design services which will include programming, product specification and selection, and layout space planning services at all phases of design as noted below for the Administration and Library buildings:

  • Program Verification / Schematic Design Phase – 35 hours
  • Design Development Phase – 20 hours
  • Documentation Phase – 12 hours
  • Contract Administration Phase – 14 hours
  • Change Management – 23 hours

POI will bill $85.00 per hour for the services requested and has estimated 104 hours of service in the proposal provided.

It is recommended that Pacific Office Interiors (POI) be awarded an agreement for the services noted in an amount not to exceed $8,840.00.

 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 83-90500-0-00000-85000-5802-010-2600
  • Source: Measure BB
  • Budget Category: Professional Services
.VI.C.11. Amendment #01 to Agreement – Districtwide – Sustainability Plan Services – Cumming Corporation – Measure ES and General Fund
Recommended Motion:

It is recommended that the Board of Education approve Contract Amendment #01 with Cumming Corporation for consulting services for the Districtwide Plan for Sustainability in an amount not to exceed $16,900.00, for a total contract amount of $96,530.00. 

Rationale:

Cumming Corporation has been requested to provide additional information, a reporting tool and data collection for the plan to ensure community members, students and staff are invited to participate in the first draft review of the plan through study sessions and town hall presentations for an amount not to exceed $16,900.00.

 
Financial Impact:

Funding Information

  • Budgeted: Yes
  • Fund: 85
  • Source: ES
  • Account Number85-90100-0-00000-85000-5802-050-2600 ($8450.00 - ES); 01-00000-0-00000-81100-5802-061-2602 ($8450.00 - General Fund)

MEASURE ES FUNDING:

  • ORIGINAL CONTRACT: $79,630.00
  • CA #01 - Districtwide – Additional consulting services: $16,900.00
  • TOTAL CONTRACT AMOUNT: $96,530.00
.VI.C.12. Accept Work as Completed – Lincoln Middle School – Field Replacement Project – Construction Contract Bid #17.13.ES.R1 – Angeles Contractor, Inc.– Measure ES
Recommended Motion:

It is recommended that the Board of Education accept as completed all construction under the contract issued to Angeles Contractor, Inc. for the Lincoln Middle School Field Replacement Project (DSA 03-117787) with a final contract amount of $4,048,702.23.

Rationale:

At the June 29, 2017, Santa Monica Malibu Unified School District Board of Education Meeting, the contract for the Lincoln Middle School Field Replacement Project was awarded to Angeles Contractor, Inc. in the amount of $4,092,000.00.  Three change orders, totaling a net credit of $43,297.77, were subsequently approved and decreased the contract amount to $4,048,702.23. 

All scope of work items have now been completed.  On April 30, 2018, a Certificate of Substantial Completion was issued to Angeles Contractor, Inc.  A punch list specifying items to be corrected and/or documents to be submitted within 30 days of Substantial Completion was provided to the Contractor.  All items listed on the punch list have been completed and documents submitted.  In compliance with statutory requirements, a Notice of Completion has been filed with the County of Los Angeles.

 
Financial Impact:
Funding Information
  • Budgeted: Yes
  • Fund: 85
  • Source: Measure BB
  • Account Number: 85-90908-0-00000-85000-6200-012-2600
  • Budget Category: Hard Costs/Construction
  • DSA #: 03-116118
.VI.C.13. Accept the work as Completed – Webster Elementary School – Window, Paint, Floors & Doors Project – Construction Contract Bid #17.10.ES - Angeles Contractor Inc. – Measure ES
Recommended Motion:

It is recommended that the Board of Education accept as completed all work as applicable to Webster Elementary School – Window, Paint, Floors & Doors Project to Angeles Contractor Inc. with a final contract amount of $2,693,845.77.

Rationale:

On April 20, 2017, the Board of Education awarded to Angeles Contractor Inc. the contract for the Webster Elementary School – Window, Paint, Floors & Doors Project in the amount of $2,690,000.00. Change Orders to the amount of $3,845.77 were required to address unforeseen site conditions and District directed changes.

In order to facilitate the release of final payment, a Notice of Completion must be filed 35 days after Substantial Completion with the County of Los Angeles pending approval by the Board of Education.

Final total contract amount was $2,693,845.77. The contract duration was 233 days.

 
Financial Impact:

Funding Information

  • BudgetedYes
  • Fund85
  • Source: Measure ES
  • Account Number: 85-90905-0-00000-85000-5640-008-2600
  • Budget Category: Construction
.VI.D. Personnel
.VI.D.1. Certificated Personnel - Elections, Separations
Recommended Motion:

It is recommended that the Board of Education approve the attached certificated appointments, separations, and assignments.

Financial Impact:

Unless otherwise noted, all items are included in the 2018-2019 approved budget

Attachments:
Certificated Personnel
.VI.D.2. Classified Personnel - Merit
Recommended Motion:

It is recommended that the attached appointments for Classified Personnel (merit system) be approved and/or ratified.

Comments:

All personnel will be properly elected in accordance with District policies and salary schedules. 

Attachments:
Classified Personnel - Merit
.VI.D.3. Personnel Commission - Non-Merit
Recommended Motion:

It is recommended that the attached appointments for Classified Personnel (merit system) be approved and/or ratified. 

Comments:

All personnel will be properly elected in accordance with District policies and salary schedules. 

Attachments:
Classified Personnel - Non-Merit
.VI.D.4. Increase in Staffing (FTE) - Special Education
Recommended Motion:

It is recommended that the Board of Education approve an increase in FTEs (2.125 FTE), as indicated below in order to meet IEP requirements and student needs for the 2018-2019 school year.

Financial Impact:

The 2018-2019 budget will be adjusted $103,474 for salary and benefits.

Comments:
  • ParaEducator 1: new position/6 hours (0.75 FTE) - Franklin Elementary
  • ParaEducator 1: new position/5 hours (0.625 FTE) - McKinley Elementary
  • ParaEducator 1: new position/4 hours (0.50 FTE) - CDS/After-School
  • ParaEducator 1: from 5 hours(0.625 FTE) to 6 hours(0.75 FTE) - Muir Elementary
  • ParaEducator 2: from 6.6 hours(0.825 FTE) to 7.6 hours (0.95 FTE) - Cabrillo Elementary
.VII. STUDY SESSION
Quick Summary / Abstract:
These items are staff presentations and/or updates to the Board of Education.
.VII.A. New Mariachi Music Program (30 minutes)
Rationale:

In an effort to support the Board of Education's focus on the integration of the Social Justice standards and bringing cultural relevance across all content areas, the VAPA Coordinator has been working with Dr. Mora and the district’s music teachers to introduce a new Mariachi music program to SMMUSD.  Staff will share an outline of the three-year strategic plan to roll out the Mariachi program at Edison Language Academy, John Adams Middle School, and Santa Monica High School.

Educational Services and site staff have prepared program updates and proposed next steps for the board to consider.

 
Comments:

Staff anticipates that this item will require a total of 30 minutes with 15 minutes for the staff report and 15 minutes for board member questions/comments.

Minutes:
Time start: 6:18 p.m. Time end: 6:58 p.m.

Staffed answered board members’ questions regarding obstacles we might anticipate in implementing this program; how we reach out to other districts about this program; how we might coordinate with SMC for dual enrollment opportunities; how this program could be implemented to more schools following the pilot; and how more cultural programs could be incorporated at Malibu High School.
Attachments:
Mariachi & Spanish-Speaking English Learners: District Initiatives, Models, & Education Policy
SMMUSD Mariachi Program
SMMUSD Mariachi Proposal
.VIII. DISCUSSION ITEMS
Quick Summary / Abstract:
These items are submitted for discussion. Any action that might be required will generally be scheduled for the next regularly scheduled Board meeting.
.VIII.A. Santa Monica Ed Foundation Quarterly Fundraising Update (15 min)Confidential agenda item.Was edited within 72 hours of the Meeting
.IX. MAJOR ACTION ITEMS
Quick Summary / Abstract:
These items are considered to be of major interest and/or importance and are presented for action at this time. Some may have been discussed by the Board at a previous meeting.
.IX.A. Approve Master Agreement between the Shark Fund and the Santa Monica-Malibu Unified Schools District (20 min)
Time Certain:
5:45 PM
Recommended Motion:

It is recommended that the Board of Education approve the Master Agreement between the Shark Fund and the Santa Monica-Malibu Unified School District (SMMUSD). 

Rationale:

On June 28, 2018, the board revised BP and AR 3290 – Acceptance of Gifts to separate fundraising vehicles for Malibu and for Santa Monica schools. 

As a result of this separation, the Malibu High School Shark Fund began the necessary process to obtain a master agreement with SMMUSD to be the Malibu schools fundraising entity. The Shark Fund submitted an amendment to the Articles of Incorporation with the Secretary of State on September 18, 2018.  The Secretary of State’s office processed the document on September 27, 2018. 

 
Comments:

The master agreement with the newly renamed Santa Monica Education Foundation and SMMUSD to fund Santa Monica schools was amended on July 19, 2018. 

 The master agreement with The Shark Fund will be attached prior to the board meeting.

Minutes:
The board postponed this item to the next board meeting.
.IX.B. Public Hearing - Negotiation Proposals for Santa Monica-Malibu Unified School District (SMMUSD) and Santa Monica-Malibu Classroom Teachers' Association (SMMCTA)
Recommended Motion:

It is recommended that the Board of Education hold a public hearing regarding the negotiation proposals for the Santa Monica-Malibu Unified School District (SMMUSD) and the Santa Monica-Malibu Classroom Teachers' Association (SMMCTA).

Actions:
Motion

It is recommended that the Board of Education hold a public hearing regarding the negotiation proposals for the Santa Monica-Malibu Unified School District (SMMUSD) and the Santa Monica-Malibu Classroom Teachers' Association (SMMCTA).

Passed with a motion by Mr. Jon Kean and a second by Ms. Laurie Lieberman.
Vote:
Yes Mr. Oscar de la Torre.
Yes Mr. Craig Foster.
Yes Mr. Jon Kean.
Yes Ms. Maria Leon-Vazquez.
Yes Ms. Laurie Lieberman.
Yes Mr. Ralph Mechur.
Yes Dr. Richard Tahvildaran-Jesswein.
Rationale:

This item allows members of the public to comment on the Articles that have been opened by SMMUSD and SMMCTA for successor negotiations of the current Collective Bargaining Agreement.  The proposals from SMMCTA and SMMSUD are located under Information in this agenda.

 
Minutes:
Time start: 7:23 p.m. Time end: 7:24 p.m.

Motion made by Mr. Kean, seconded by Ms. Lieberman, and voted 6/0 (Mr. de la Torre was absent) to open the closed session. It was moved by Ms. Leon-Vazquez, seconded by Ms. Lieberman, and voted 6/0 (Mr. de la Torre was absent) to close the public hearing.
.X. INFORMATIONAL ITEMS
Quick Summary / Abstract:
These items are submitted for the public record for information. These items do not require discussion nor action.
.X.A. Quarterly Report on Disability Harassment Reporting
Rationale:

To comply with BP 5145.10 Disability Harassment this item is to come before the Board as an information item each quarter. This report includes reports from July 1, 2018 – September 30, 2018 (1st Quarter).

Quarter covered by this report:

  • 1st     Quarter - July 1 to September 30 (Reporting in October)
  • 2nd     Quarter - October 1 to December 31 (Reporting in January)
  • 3rd      Quarter - January 1 to March 31 (Reporting in April)
  • 4th      Quarter - April 1 to June 30 (Reporting in July)

Reports:

  • No reports were filed during the quarter indicated.
  • Reports were filed at the schools or district offices listed in the report
 
.X.B. Quarterly Report on Hate-Motivated Behavior
Rationale:

To comply with BP 5145.9 - Hate-Motivated Behavior, this item is to come before the Board as an information item each quarter.  This report includes reports from July 1, 2018 – September 30, 2018 (1st Quarter).

Quarter covered by this report:

  • 1st     Quarter - July 1 to September 30 (Reporting in October)
  • 2nd     Quarter - October 1 to December 31 (Reporting in January)
  • 3rd      Quarter - January 1 to March 31 (Reporting in April)
  • 4th      Quarter - April 1 to June 30 (Reporting in July)

Reports:

  • No reports were filed during the quarter indicated.
  • Reports were filed at the schools or district offices listed in the report
 
.X.C. Santa Monica-Malibu Unified School District (SMMUSD) Sunshine Proposal to Open Successor Negotiations with the Santa Monica-Malibu Classroom Teachers' Association (SMMCTA)
Recommended Motion:

This is to inform the Board of Education that the District intends to open successor negotiations with the Santa Monica-Malibu Classroom Teachers' Association (SMMCTA) per Article XXXVI of the existing Collective Bargaining Agreement.

Rationale:

The Rodda Act requires parties negotiations a collective bargaining agreement to give public notice of their proposals at a public meeting.  By "sunshining" proposals in this fashion, SMMUSD is announcing their intent to negotiate.

The District proposal is attached.  SMMCTA's public notice of its proposals is the following item.  The public will have an opportunity to comment on SMMCTA and the District's proposals at the public hearing listed under Major Action Items in this agenda.

 
Attachments:
District Sunshine Proposal
.X.D. Santa Monica-Malibu Classroom Teachers' Association (SMMCTA) Sunshine Proposal to Open Successor Negotiations with the Santa Monica-Malibu Unified School District (SMMUSD)
Recommended Motion:

This is to inform the Board of Education that the Santa Monica-Malibu Classroom Teachers' Association (SMMCTA) intends to open successor negotiations with the District (SMMUSD), per Article XXXVI of the existing Collective Bargaining Agreement.

Rationale:

The Rodda Act requires parties negotiating a collective bargaining agreement to give public notice of their proposals at a public meeting.  By "sunshining" proposals in this fashion, SMMCTA is announcing their intent to negotiate.

SMMCTA's proposal is attached.  The District's public notice of its proposal is the previous item.  The public will have the opportunity to comment on SMMCTA and the District's proposals at the public hearing listed under Major Action Items in this agenda.


 
Attachments:
SMMCTA Sunshine Proposal
.XI. GENERAL PUBLIC COMMENTS
.XII. BOARD MEMBER ITEMS
Quick Summary / Abstract:
These items are submitted by individual board members for information or discussion, as per Board Policy 9322.
.XIII. REQUESTS BY MEMBERS OF THE PUBLIC OR DISTRICT ADVISORY COMMITTEES TO ADDRESS THE BOARD OF EDUCATION
Quick Summary / Abstract:
A member of the public may request that a matter within the jurisdiction of the board be placed on the agenda of a regular meeting, as per Board Policy 9322. The request shall be in writing and be submitted to the superintendent or designee with supporting documents and information, if any, at least one week before the scheduled meeting date. Items submitted less than a week before the scheduled meeting date may be postponed to a later meeting in order to allow sufficient time for consideration and research of the issue. The board president and superintendent shall decide whether a request is within the subject matter jurisdiction of the board. Items not within the subject matter jurisdiction of the board may not be placed on the agenda. In addition, the board president and superintendent shall determine if the item is merely a request for information or whether the issue is covered by an existing policy or administrative regulation before placing the item on the agenda.
.XIV. CONTINUATION OF PUBLIC COMMENTS
Quick Summary / Abstract:
A continuation of Section VIII, as needed. (If the number of persons wishing to address the Board of Education exceeds the time limit in section VIII, additional time will be provided in Section XVI, CONTINUATION OF PUBLIC COMMENTS.)
.XV. BOARD MEMBER COMMENTS
Quick Summary / Abstract:
A Board member may make a brief announcement or report on his/her own activities relative to Board business. There can be no discussion under “BOARD MEMBER COMMENTS.”
Minutes:
Time start: 7:24 p.m. Time end: 7:27 p.m.

* Ms. Lieberman attended the recent Samohi orchestra and choir performances, both of which she said were extraordinary and fun. She said the composers and musical choices represented different cultural backgrounds.
* Ms. Leon-Vazquez wondered if there was a way for our dance students to travel to Cuba to see the National Ballet of Cuba, who were supposed to perform at the Hollywood Bowl this past August, but were denied entrance to U.S. due to visa complications.
.XVI. FUTURE AGENDA ITEMS
Quick Summary / Abstract:
Items for future consideration will be listed with the projected date of consideration. The Board of Education will be given any backup information available at this time.
.XVII. ADJOURNMENT
Quick Summary / Abstract:

This meeting will adjourn to a regular meeting scheduled for Thursday, November 1, 2018, at 5:30 p.m. in the Malibu City Council Chambers: 23825 Stuart Ranch Road, Malibu, CA.

Minutes:
It was moved by Ms. Lieberman, seconded by Ms. Leon-Vazquez, and voted 7/0 to adjourn the meeting at 7:27 p.m. in memory of Beverly Waters, a retired, long-term Samohi Vice Principal. The next meeting is a regular meeting scheduled for Thursday, November 1, 2018, at 5:30 p.m. in the Malibu City Council Chambers: 23825 Stuart Ranch Road, Malibu, CA.
Disability Information:
The live stream of regular board meetings in progress are available online. Meetings in Malibu City Hall: https://www.youtube.com/user/CityofMalibu. Meetings at the district office: https://www.youtube.com/user/Citytv16santamonica. Meetings held at the District Office and in Malibu are taped and rebroadcast in Santa Monica on CityTV2, Cable Channel 20 – Check TV listing. Meetings are rebroadcast in Malibu on Government Access Ch. 3 every Saturday at 8pm. ---------------- In compliance with the Americans with Disabilities Act, for those requiring special assistance to access the board meeting room, to access written documents being discussed at the board meeting, or to otherwise participate at board meetings, please contact the superintendent’s office at 310.450.8338 for assistance. Notification at least 48 hours before the meeting will enable the district to make reasonable arrangements to ensure accessibility to the board meeting and to provide required accommodations, auxiliary aids or services.
10/18/2018 4:30:00 PM ( Original )
AbsentMr. Oscar de la Torre
PresentMr. Craig Foster
PresentMr. Jon Kean
AbsentMs. Maria Leon-Vazquez
PresentMs. Laurie Lieberman
PresentMr. Ralph Mechur
PresentDr. Richard Tahvildaran-Jesswein
10/18/2018 4:50:00 PM
PresentMr. Oscar de la Torre
10/18/2018 4:40:00 PM
PresentMs. Maria Leon-Vazquez

The resubmit was successful.